US DoD
29 Mar, 12Bell-Boeing Joint Project Office, Amarillo, Texas, is being awarded a $9,000,000 modification to the previously awarded V-22 Lot 17 advance acquisition contract (N00019-12-C-2001) to provide additional funding for long lead components required for the manufacture and delivery of four, fiscal 2013 Lot 17 CV-22 tiltrotor aircraft for the Air Force. Work will be performed in Ridley Park, Pa. (50 percent), Forth Worth, Texas (25 percent), and Amarillo, Texas (25 percent). Work is expected to be completed in December 2012. Contract funds will not expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Md., is the contracting activity.
Related Posts
- Bell-Boeing awarded $40M for long-lead V-22 components
- Breeze-Eastern to Design and Produce New Winch for MV-22
- Bell takes 407AH to SOFIC 2013
- V-22s delivered to USMC’s presidential squadron
- VMM-266R conducts MV-22B maintenance aboard USS Kearsarge
- ‘Phrogs’ retire as Corps transitions to Osprey
- Bell laying off 140 employees
- Israel to become first V-22 export destination
- US Navy dry cargo ship conducts MV-22 flight trials
- Hydraulics International awarded $7M for V-22 hydraulic power supply carts
- Bell/Boeing awarded $73M V-22 component repair contract
- Ospreys make debut in Thailand
- Rolls-Royce awarded $9M more for MV-22 engine contract
- Bell awarded patent for twin-tail tiltrotor
- MV-22s train in the Philippines with local Air Force
- Rolls-Royce awarded $83M option for V-22 engines
- First Presidential V-22 takes flight
- MV-22 Ospreys conduct first flights in Japan
- Israeli pilots give detailed assessment of V-22
- Bell-Boeing awarded $33M delivery order for V-22 avionics







