RAF Merlin helicopters end Afghan operations

RAF Merlin helicopters end Afghan operations

5-Jun-2013 Source: Royal Air Force

The RAF’s Merlin helicopter fleet has finished operations in Afghanistan after providing nearly 4 years of continuous front line support.

The Merlins have flown more than 18,000 hours in the dust and heat of Helmand – moving more than 7,900 tonnes of kit and stores and transporting over 130,000 personnel during that time. The Merlin has been primarily used as a troop transporter and has shared that role with the workhorse Chinook helicopter since 2009.

But as the UK military hands over security responsibility to Afghan forces, the number of UK bases in Helmand Province has fallen – from 137 in 2010 to 11 this year – meaning fewer helicopters are needed to support them.

The requirement for helicopters in theatre has fallen by around 40 per cent in the past three years. In 2010, helicopter support hours totalled around 2,300 hours a month –now fallen it’s around 1,350 hours a month.

As a result, the Merlin fleet and its crews can now return to the UK to prepare for potential future roles.

The end of Merlin operations in Afghanistan shows the changing role of British and other international forces as the process of transition to an Afghan security lead continues apace. As Prime Minister David Cameron has already announced, the number the British forces in Afghanistan will fall to around 5,200 by the end of this year, from a peak of 9,500 in 2012.

Defence Secretary Philip Hammond said:

“The Afghan National Security Forces are growing in capability and their success is driving the transition and redeployment process. Afghan security forces are on track to take on responsibility for all operations across the country this summer and their success means we have been able to reduce the number of our bases – with consequently fewer helicopters needed to serve them.

“The Merlin fleet has served with distinction in Afghanistan but our role has changed significantly in recent months and returning the Merlin fleet now is a key element of our orderly drawdown from Afghanistan.

“British forces on the ground still retain appropriate capability to move personnel and equipment by air as required, as well as support our Afghan and ISAF colleagues. Our troops will continue to be resourced properly for the roles they are conducting and our drawdown of equipment will be done in a way that does not compromise our ongoing operations or put our personnel at additional risk.”

Group Captain Frazer Nicholson, Commander of the Joint Aviation Group, based in Camp Bastion, Afghanistan, said:

“The Merlin helicopters have proven to be capable air asset that have tirelessly moved personnel and equipment in a really demanding environment.

“Camp Bastion is nearly 3,000 feet above sea level, dusty, and over 40 degrees in the summer. That environment is incredibly tough on all helicopters but the Merlins have fared well.”

Squadron Leader Kevin Harris, Officer Commanding 1419 Flight, Merlin Detachment, Camp Bastion, said:

“The aircrew and engineers have worked tirelessly to operate the Merlins in support of UK forces in Afghanistan and it has been an immense privilege to have commanded such a fine group of young men and women.

“The aircrew will return to RAF Benson in Oxfordshire where they will take some well earned leave and the engineers will remain in Afghanistan to dismantle the aircraft for their onward transportation back to the UK.

“The Merlins will undergo an extensive programme of maintenance and cleaning before being packed up, ensuring they return to the UK in good order.”

Engineers in Camp Bastion are now hard at work preparing the Merlin helicopters for their journey back to the UK. Each helicopter will have its rotor blades and tail removed and will undergo a full “bio-wash” to remove dust and insects, before being loaded onto a wheeled transport unit that will be driven on board a huge RAF C-17 Globemaster aircraft for the trip home.

A Royal Air Force Merlin helicopter takes off with an underslung load in Afghanistan. Britain’s fleet of Merlin HC3 helicopters have carried out their final operations in Afghanistan, after nearly four years of providing continuous support to British forces on the front line.

A Royal Air Force Merlin helicopter being packed and secured in to a Royal Air Force C17 Globemaster aircraft.

Members of II Squadron, RAF Regiment, Force Protection for Camp Bastion, Afghanistan are pictured as an RAF Merlin Helicoper arrives to return them to Camp Bastion after patrolling forward of Patrol Base Boldak in Helmand Province.

A Royal Air Force Merlin helicopter being packed and secured in to a Royal Air Force C17 Globemaster aircraft.

, , , , , ,

Copyright © 2024 HeliHub

Website by Design Inc

Helihub logo

X