CH-53

Page 1 of 2

12
Sikorsky awarded $60M contracts for CH-53K parts

Sikorsky awarded $60M contracts for CH-53K parts

26-Sep-2023Source: US DoD

Sikorsky Aircraft Corp., Stratford, Connecticut, is awarded $17,708,419 for a firm-fixed-price delivery order (N00383-23-F-X961), under previously awarded contract N00383-20-G-X901, for the procurement of 11 blowdown assemblies, seven NRP shock strut assemblies, seven shock strut assembly-main LH parts, seven nose landing gear retract actuators, 36 shimmy damper units, 30 wheel and tire assemblies, 30 shimmy damper... Read more

Raytheon awarded $48M contract for repair and support of V-22s and CH-53s

Raytheon awarded $48M contract for repair and support of V-22s and CH-53s

31-Aug-2023Source: US DoD

Raytheon Co., McKinney, Texas, is awarded $48,783,210 a firm-fixed-price, performance-based logistics requirements contract for the repair of 10 forward-looking infrared components in support of the V-22 and CH-53 helicopters. This contract includes a five-year base period with no options. Work will be performed in McKinney, Texas (40%); El Segundo, California (30%); Jacksonville, Florida (15%); and... Read more

Israeli Air Force merging two helicopter squadrons

Israeli Air Force merging two helicopter squadrons

11-Jul-2022Source: ENews

The Israeli Air Force will merge two of its helicopter squadrons next year, ahead of the arrival of a dozen advanced heavy transport helicopters that will replace Israel’s aging fleet of CH-53 Sea Stallion helicopters. See Full Story.... Read more

Integral Aerospace awarded $9M contract for repair of parts of CH-53 fuel tanks

Integral Aerospace awarded $9M contract for repair of parts of CH-53 fuel tanks

18-Aug-2021Source: US DoD

Integral Aerospace, Santa Ana, California, is awarded a $9,995,600 five-year, long-term, firm-fixed-priced requirements contract for the repair of two parts associated with the 650 gallon fuel tanks in support of the CH-53 aircraft. All work will be performed in Santa Ana, California, and the ordering period is expected to be completed by August 2026. No... Read more

Rheinmetall starts maintenance on German Air Force CH-53G fleet

Rheinmetall starts maintenance on German Air Force CH-53G fleet

18-May-2021

Rheinmetall has taken over maintenance operations for the Bundeswehr’s fleet of CH-53G helicopters, as planned. Embedded in the organization of the 64th Helicopter Squadron at Diepholz Air Base, Rheinmetall Aviation Services GmbH now received the first two aircrafts in their maintenance bay. The takeover of maintenance operations by Rheinmetall proceeded remarkably smooth and quickly. The... Read more

SAFE awarded USAF contract for CH-53 maintenance platforms

SAFE awarded USAF contract for CH-53 maintenance platforms

22-Sep-2020Source: S.A.F.E. Structure Designs

S.A.F.E. Structure Designs is pleased to announce the GSA contract award for Sikorsky CH-53 fall protection platforms for the USAF Maintenance Training facility at Lackland Air Force Base . The exclusive design of the S.A.F.E. CH-53 fall protection platforms incorporates many unique safety elements. Key features include a handrail system designed to contour around the... Read more

03-Sep-20 ?????? Sikorsky CH-53E Sneads Ferry, US-North Carolina

03-Sep-20 ?????? Sikorsky CH-53E Sneads Ferry, US-North Carolina

3-Sep-2020

No details found on why this CH-53E made an emergency landing, but it ended up burning out on the ground after landing.  All 4 POB out safely.... Read more

Sikorsky awarded $717M Contract for CH-53 and MH-53 Repair Support

Sikorsky awarded $717M Contract for CH-53 and MH-53 Repair Support

25-Oct-2018Source: US DoD

Sikorsky Aircraft Corp., Stratford, Connecticut, is awarded a $717,410,825 firm-fixed-priced, performance-based logistics requirements contract for logistics and repair support for 98 components in support of CH-53 and MH-53 aircraft weapon replaceable assembly components and their related shop replaceable assembly components. This contract includes a 50-month base period with no options. Work will be performed in... Read more

Raytheon Awarded $60M Contract for CH-53 and V-22 Support

Raytheon Awarded $60M Contract for CH-53 and V-22 Support

30-Aug-2018Source: US DoD

Raytheon Co., McKinney, Texas, is awarded a five-year performance-based logistics contract (N00383-18-D-PH01) in the amount of $59,717,916 for support of the CH-53 and V-22 Forward Looking InfraredSystem.  The first delivery order for the first year of the contract will be issued concurrently with the award of the basic contract in the amount of $15,971,160.  Work will... Read more

King Stallion and Chinook to battle for Israeli order

King Stallion and Chinook to battle for Israeli order

7-Aug-2017Source: HeliHub.com

Israeli is looking to modernizing their heavy-lift helicopter fleet by replacing their CH-53 Yasur helicopters. The fleet has been in service for over 50 years and although they have recently been upgraded, a replacement is needed. The money for the replacement will come from the MoU of $38 billion signed in 2016 between Washington and... Read more

German CH-53 retrofit program to feature Esterline avionics

German CH-53 retrofit program to feature Esterline avionics

4-Jul-2017Source: Esterline

Esterline Corporation (www.esterline.com) (NYSE Symbol: ESL), a leading global specialty manufacturer primarily serving the aerospace and defense markets, is pleased to announce the award of a contract from Airbus Helicopters to supply its CMC Electronics brand Integrated Helicopter Solution for the upgrade of the German Armed Forces’ CH-53GS/GE Sea Stallion helicopters. The upgrade features the... Read more

Sikorsky expects over 200 export orders for CH-53K

Sikorsky expects over 200 export orders for CH-53K

5-Jun-2017Source: HeliHub.com

Sikorsky hopes to gain a 200 export order for their new CH-53K King Stallion heavy lift helicopter. Both Germany and Israel are looking to replace their aging fleets of CH-53s with Sikorsky’s newest CH-53K King Stallion. Germany seems the most likely opportunity, as they plan to release a RFP by 2018. Their competition for the... Read more

Airbus awarded contract to retrofit 26 Bundeswehr CH-53 helicopters

Airbus awarded contract to retrofit 26 Bundeswehr CH-53 helicopters

28-Feb-2017Source: Airbus Helicopters

Airbus Helicopters has received an order from the Federal Office of Bundeswehr Equipment, Information Technology and In-Service Support (BAAINBw) to retrofit 26 CH-53 heavy transport helicopters. This contract will cover obsolescence management for components that are no longer available on the market and will begin by replacing them with up-to-date parts. This retrofit will guarantee the... Read more

USMC to upgrade all 147 CH-53E helicopters

USMC to upgrade all 147 CH-53E helicopters

11-Aug-2016Source: USMC

U.S. Marine Corps has begun a full reset of its CH-53E Super Stallion heavy lift helicopters, an effort aimed at significantly increasing the number of operationally fit aircraft and addressing systemic issues, which in recent years drove the platform’s readiness level to unsustainable depths. The issue first came to light following the January 2014 crash... Read more

CH-53K King Stallion Achieves 27,000 Pound External Lift

CH-53K King Stallion Achieves 27,000 Pound External Lift

24-Jun-2016Source: CH-53

Lockheed Martin today announced the CH-53K King Stallion successfully completed an external lift of a 27,000 pound payload at Sikorsky’s Development Flight Test Center in West Palm Beach, Fla. The aircraft executed an “out of ground effect” (OGE) external load test at 100 feet above the ground while performing hover maneuvers to demonstrate its excellent... Read more

CH-53K load testing continues with 20,000 pound lift

CH-53K load testing continues with 20,000 pound lift

31-May-2016Source: HeliHub.com

The U.S. Marine Corps has confirmed that the CH-53K has completed its first external load flight test carrying a 20,000 lb. load.  The achievement was made on May 26 at Sikorsky Aircraft Corporation’s Development Flight Center in West Palm Beach, Fla. Envelope expansion tests are continuing with incrementally increasing speeds with the 20,000 load, and... Read more

Sikorsky awarded $16M for US Navy H-53 and H-60 field support

Sikorsky awarded $16M for US Navy H-53 and H-60 field support

29-Apr-2016Source: US DoD

Sikorsky Support Services, Inc., Stratford, Connecticut, is being awarded a $16,232,698 indefinite-delivery/indefinite-quantity contract for engineering technical services and field services in support of the H-53 and H-60 aircraft, subsystems, and associated support equipment. Work will be performed in Miramar, California (22 percent); McGuire Air Force Base (22 percent); New River, North Carolina (22 percent); Mayport... Read more

CH-53K makes first external lift flight

CH-53K makes first external lift flight

26-Apr-2016Source: Sikorsky

Lockheed Martin (NYSE:LMT) today announced the CH-53K helicopter has achieved its first external lift flight by successfully carrying a 12,000 pound external load. “Achieving our first external lift signifies another milestone for the CH-53K program,” said Mike Torok, Sikorsky’s Vice President of CH-53K Programs. “Our flight envelope expansion efforts remain on track, and we continue... Read more

Sikorsky awarded $25M for long lead items for CH-53K early production

Sikorsky awarded $25M for long lead items for CH-53K early production

21-Apr-2016Source: US DoD

Sikorsky Aircraft Corp., Stratford, Connecticut, is being awarded a $25,000,000 advance acquisition contract for the long lead items in support of low-rate initial production Lot 1 of two CH-53K aircraft.  Work will be performed in West Palm Beach, Florida, and is expected to be completed in October 2021.  Fiscal 2016 aircraft procurement (Navy) funds in... Read more

Triumph Group receives 2016 Supplier Excellence Award from AHS

Triumph Group receives 2016 Supplier Excellence Award from AHS

8-Apr-2016Source: Triumph Group

Triumph Group, Inc. (NYSE: TGI) today announced that it has received the 2016 Supplier Excellence Award from the American Helicopter Society International (“AHS International”) in recognition of the quality, innovation and cost-effective technology of its products. The AHA International Supplier Excellence Award is given to companies that make a notable contribution to improving the state... Read more

German CH-53 upgrades to include FMS and Multi-Function Displays from CMC

German CH-53 upgrades to include FMS and Multi-Function Displays from CMC

24-Mar-2016Source: CMC Electronics

Esterline CMC Electronics’ CMA-9000 Flight Management System (FMS) and MFD-3068 Multi-Function Display have been selected by Airbus Helicopters and the German Armed Forces for the upgrade of their CH-53GS/GE Sea Stallion helicopters. The CMA-9000 FMS and MFD-3068 will enhance the existing CH-53 capabilities by providing a flexible, modernized cockpit with improved civil navigation (IFR) features... Read more

EDA completes Cold Blade 2016 Multinational Helicopter Exercise

EDA completes Cold Blade 2016 Multinational Helicopter Exercise

24-Mar-2016Source: EDA

Exercise COLD BLADE 2016, hosted by the Finnish Defence Forces, was formally completed Wednesday evening March 16th 2016 by the Chief of Finnish Army Aviation, LtCol Jaro Kesänen. At exercise closure, a total of 290 hours had been flown on 156 missions with 3 participating Member States (Finland and Germany, as well as Sweden which sent... Read more

Second CH-53K joins flight test program

Second CH-53K joins flight test program

15-Mar-2016Source: Sikorsky

Sikorsky, a Lockheed Martin Company (NYSE: LMT), today announced the second CH-53K helicopter has joined the flight test program and achieved first flight. In addition the first aircraft into the test program has achieved flight envelope expansion to 120 knots for the U.S. Marine Corps’ CH-53K King Stallion heavy lift helicopter program. “Adding a second aircraft... Read more

Erickson Elevates Legacy Aircraft Maintenance Services Program

Erickson Elevates Legacy Aircraft Maintenance Services Program

2-Mar-2016Source: Erickson

Erickson Incorporated (NASDAQ:EAC), a leading global provider of aviation services, has increased its support of legacy aircraft with several key project updates. “We have more than 200 mechanics and engineers on our team at Erickson,” said Kerry Jarandson, Erickson’s Vice President of MRO and Manufacturing. “They have taken our existing offering of services for legacy aircraft, and... Read more

Super Stallion is worn out, says report

Super Stallion is worn out, says report

26-Feb-2016Source: Pilot Online

The internal military report leads with a warning, typed in bold: If called to war tonight, the Marine Corps could only meet operational demands by deploying nearly every heavy-lift transport helicopter remaining in its inventory. See Full Story... Read more

Two Connecticut Senators urge Germany to buy CH-53K

Two Connecticut Senators urge Germany to buy CH-53K

22-Feb-2016Source: Chris Murphy

Today, ahead of Germany’s planned procurement of up to 70 heavy-lift helicopters, U.S. Senator Chris Murphy (D-Conn.) and U.S. Senator Richard Blumenthal (D-Conn.) sent a letter to German Defense Minister Ursula von der Leyen urging the country to replace their existing fleet with the new, Sikorsky-made CH-53K King Stallion aircraft. Murphy and Blumenthal emphasized that... Read more

Sikorsky awarded $8M delivery order for H-53 in-service program

Sikorsky awarded $8M delivery order for H-53 in-service program

31-Jan-2016Source: US DoD

Sikorsky Aircraft Corp., Stratford, Connecticut, is being awarded $7,893,500 for delivery order 5306 against a previously issued basic ordering agreement (N00019-14-G-0004) to incorporate Nacelles physical configuration audit support and 36 total production kits in support of the MH-53 and CH-53 in-service program.  Work will be performed in Tallahassee, Alabama (90 percent); and Stratford, Connecticut (10... Read more

General Nucleonics awarded $16M contract for H-53 work

General Nucleonics awarded $16M contract for H-53 work

18-Jan-2016Source: US DoD

General Nucleonics Inc., Pomona, California, is being awarded a $16,577,014 firm-fixed-price long-term requirements contract for the repair for three weapons replaceable assemblies in support of the Main Rotor Blade In Flight Inspection System utilized on the H-53 aircraft.  Work will be performed in Pomona, California, and work is expected to be completed by June 2020. ... Read more

Erickson to refurbish two MH-53E Sea Dragons

Erickson to refurbish two MH-53E Sea Dragons

7-Jan-2016Source: Erickson

Erickson Incorporated (NASDAQ:EAC), a leading global provider of aviation services, has been selected as a subcontractor by Adams Communication & Engineering Technologies (ACET) for the refurbishment of two MH-53E helicopters, in support of the United States Navy Heavy Lift Helicopter Program. “Erickson is pleased to partner with ACET in support of this project,” said Jeff... Read more

Germany brings forward CH-53G retirement

Germany brings forward CH-53G retirement

7-Dec-2015Source: Forecast International

The German Air Force is readying for a new replacement to its fleet of 1970s-legacy VFW-Sikorsky CH-53G/GS/GA Stallions.See full story... Read more

First flight of Sikorsky CH-53K

First flight of Sikorsky CH-53K

27-Oct-2015Source: Sikorsky

Sikorsky Aircraft Corp., a subsidiary of United Technologies Corp. (NYSE:UTX),  today announced the successful first flight of the U.S. Marine Corps’ CH-53K King Stallion heavy lift helicopter protoype, known as Engineering Development Model-1 (EDM-1). The 30-minute flight signals the beginning of a 2,000-hour flight test program using four test aircraft. “EDM-1’s first flight signifies another major milestone... Read more

27-Oct-15 Sikorsky CH-53E Castelvetrano, Italy

27-Oct-15 Sikorsky CH-53E Castelvetrano, Italy

27-Oct-2015

Emergency landing made in public park... Read more

Sikorsky awarded $191M confract for H-53 weapons work

Sikorsky awarded $191M confract for H-53 weapons work

14-Oct-2015Source: US DoD

Sikorsky Aircraft Corp., Stratford, Connecticut, is being awarded a $191,530,501 firm-fixed-price requirements contract for repair coverage of six weapons replaceable assemblies in support of the CH-53 and MH-53 aircraft.  Work will be performed in Stratford, Connecticut.  Work is expected to be completed by December 2017.  No contract funds will be obligated at the time of... Read more

US Navy revives MH-53E Sea Dragon training squadron HM-12

US Navy revives MH-53E Sea Dragon training squadron HM-12

1-Oct-2015Source: PilotOnline

Having been disestablished in 1994, HM-12 will once again serve as a fleet replacement squadron, where new pilots and crew members go to learn how to fly their designated aircraft. See full story... Read more

02-Sep-15 Sikorsky CH-53E Camp Lejeune, US-North Carolina (1F)

02-Sep-15 Sikorsky CH-53E Camp Lejeune, US-North Carolina (1F)

2-Sep-2015

Hard landing while conducting Helicopter Rope Suspension Techniques (HRST) training in a landing zone at Stone Bay, a satellite training area aboard Camp Lejeune.  About 20 Marines from Virginia and North Carolina were participating  in night training that requires them to exit through the back of a helicopter using suspended ropes. The rappelling and fast-rope... Read more

Northrop Grumman awarded $14M contract for MH-53E mine hunting sonar systems

Northrop Grumman awarded $14M contract for MH-53E mine hunting sonar systems

20-Jul-2015Source: US DoD

Northrop Grumman Systems Corp., Annapolis, Maryland, is being awarded a not-to-exceed $14,761,000 value cost-plus-fixed-fee, firm-fixed-price contract for the design, development, fabrication, testing, production and delivery of AN/AQS-24C mine hunting sonar systems. The purpose of this effort is to meet an urgent operational need for volume search minehunting capability deployed from the MH-53E Sea Dragon helicopter.... Read more

Sikorsky awarded $38M for critical parts for CH-53K prototypes

Sikorsky awarded $38M for critical parts for CH-53K prototypes

15-Jun-2015Source: US DoD

Sikorsky Aircraft Corp., Stratford, Connecticut, is being awarded a $38,838,189 modification to a previously awarded cost-plus-incentive-fee contract (N00019-06-C-0081) for the procurement of critical parts and associated support for two CH-53K system demonstration test article aircraft. The critical parts include forgings, castings, cores, beams, blocks for assemblies, frames, skins, spars and fitting assemblies. Work will be... Read more

Korean Air to deliver maintenance services for US Navy’s CH-53 helicopters

Korean Air to deliver maintenance services for US Navy’s CH-53 helicopters

29-May-2015Source: naval-technology

The US Navy has selected Korean Air as the sole provider of depot-level maintenance services for its CH-53 heavy-lift helicopters. See Full Story... Read more

Sikorsky awarded $480M weapons contract

Sikorsky awarded $480M weapons contract

19-Apr-2015Source: US DoD

Sikorsky Aircraft CorporationCorp., Stratford, Connecticut, has been awarded a maximum $480,000,000 firm-fixed-price contract for spare parts that will be used in various weapon system platforms, including the H-53 and H-60 platforms. Estimated value cited is based on demand quantities for the life of the contract. This contract was a sole-source acquisition. This is a five-year... Read more

15-Apr-15 Sikorsky CH-53E Solana Beach, US-California

15-Apr-15 Sikorsky CH-53E Solana Beach, US-California

15-Apr-2015

Emergency landing on public beach after reported oil leak... Read more

PPG produces transparencies for first S-97 Raider

PPG produces transparencies for first S-97 Raider

27-Mar-2015Source: PPG

PPG Industries’ (NYSE:PPG) aerospace transparencies group produced the transparencies for the S-97 RAIDER™ rotorcraft prototype rolled out by Sikorsky Aircraft Corp. The 14-square-foot windshields are polycarbonate laminates for high impact strength and light weight with proprietary protective coatings to extend service life, according to Brent Wright, PPG global platform director for aerospace transparencies. “Sikorsky wanted... Read more

12-Feb-15 Sikorsky MH-53E Norfolk, US-Virginia

12-Feb-15 Sikorsky MH-53E Norfolk, US-Virginia

12-Feb-2015

Precautionary landing shortly after take off – MH-53E is currently focus of safety inspections regarding wiring and fuel lines... Read more

US Navy issues corrective action directive for CH-53E and MH-53E

US Navy issues corrective action directive for CH-53E and MH-53E

10-Feb-2015Source: US Navy

Issued Feb 6th –  U.S. Navy and Marine Corps leadership conducted a review board at Naval Air Systems Command (NAVAIR) Feb. 6, 2015, to determine the effectiveness of mitigation measures that were put in place after the January 2014 MH-53E mishap. After an initial assessment by NAVAIR’s Heavy Lift Helicopters Program (PMA-261), the in-service support... Read more

GE awarded $29M contract for six GE38 engines for CH-53K

GE awarded $29M contract for six GE38 engines for CH-53K

16-Jan-2015Source: US DoD

General Electric Co., Lynn, Massachusetts, is being awarded a $28,997,331 modification to a previously awarded firm-fixed-price contract (N00019-13-C-0132) for the procurement of six T408-GE-400 (GE38-1B) System Demonstration Test Article engines in support of the CH-53K helicopter program. Work will be performed in South Windsor, Connecticut (17 percent); Lynn, Massachusetts (15 percent), Evendale, Ohio (12 percent),... Read more

CPI Aero to Present at the Noble Financial Capital Markets Conference

CPI Aero to Present at the Noble Financial Capital Markets Conference

13-Jan-2015Source: CPI Aero

CPI Aerostructures, Inc. (“CPI Aero®”) (NYSE MKT: CVU) today announced that its management will present at the Noble Financial Capital Markets Eleventh Annual Equity Conference on Tuesday, January 20, 2015 at 2:30 pm ET at Club Med Sandpiper Bay, in South Florida. Investors will be able to access the live video webcast of the presentation... Read more

Sikorsky Named Exemplary University Partner

Sikorsky Named Exemplary University Partner

5-Nov-2014Source: Sikorsky

Sikorsky Aircraft, a subsidiary of United Technologies Corp. (NYSE: UTX), received the Exemplary Partner Award from the Professional Advisory Board of the Tagliatela College of Engineering (TCoE) at the University of New Haven on Saturday. The award recognizes the extraordinary support Sikorsky has provided to Tagliatela’s Engineering program during a five-year partnership. “This is a... Read more

Rockwell Collins awarded $8.6M delivery order for MH-53E software upgrade project

Rockwell Collins awarded $8.6M delivery order for MH-53E software upgrade project

1-Oct-2014Source: US DoD

Rockwell Collins, Inc., Cedar Rapids, Iowa, is being awarded $8,692,133 for cost-plus-fixed-fee delivery order 0032 against a previously issued Basic Ordering Agreement (N00019-11-G-0018) for integration of one Operational Flight Program for the Required Navigation Performance for Area Navigation software upgrade program for the MH-53E Type Model Series aircraft. Work will be performed in Cedar Rapids,... Read more

CNAL Releases Investigation Results of MH-53E Crash

CNAL Releases Investigation Results of MH-53E Crash

15-Sep-2014Source: CNAL

Commander, Naval Air Force Atlantic (CNAL) released the results today of the Judge Advocate General Manual (JAGMAN) investigation in to the crash of an MH-53E Sea Dragon off the coast of Virginia January 8, that resulted in the death of three Sailors. The MH-53E, assigned to Helicopter Mine Countermeasures Squadron Fourteen (HM-14) and based at... Read more

01-Sep-14 Sikorsky CH-53E Gulf of Aden, Djibouti

01-Sep-14 Sikorsky CH-53E Gulf of Aden, Djibouti

1-Sep-2014

CH-53E Super Stallion helicopter crashed at sea in the Gulf of Aden as it attempted to land aboard USS Mesa Verde.  All 25 persons aboard the helicopter; 17 Marines and eight Navy Sailors, were safely recovered... Read more

GE awarded $68M contract more for CH-53K engines

GE awarded $68M contract more for CH-53K engines

4-Aug-2014Source: US DoD

General Electric Co., Lynn, Massachusetts, is being awarded a $68,550,240 modification to a previously awarded firm-fixed-price contract (N00019-13-C-0132) for the procurement of 16 GE38-1B engines, closure kits, tooling, and associated systems engineering and program management in support of the CH-53K helicopter program. Work will be performed in Lynn, Massachusetts, and is expected to be completed... Read more

Airbus Helicopters picks Donaldson filters for German CH-53GA upgrades

Airbus Helicopters picks Donaldson filters for German CH-53GA upgrades

15-Jul-2014Source: Donaldson

Donaldson Aerospace & Defense, a division of Donaldson Company, Inc. (NYSE: DCI), has been selected to provide air filtration systems for  CH-53 transport helicopters that Airbus Helicopters is upgrading for the German military. Donaldson’s products will filter cooling air for avionics bays on 40 medium-lift CH-53Gs that Airbus Helicopters is upgrading to the -53GA configuration... Read more

Walbridge Aldinger awarded $21M order under CH-53K facility contract

Walbridge Aldinger awarded $21M order under CH-53K facility contract

1-Jun-2014Source: US DoD

Walbridge Aldinger Co., Detroit, Michigan, is being awarded $21,550,080 for firm-fixed-price task order 0005 under a previously awarded multiple award construction contract (N40085-10-D-5331) for construction of a CH-53K helicopter maintenance training facility and Regional Communication Station (RCS) at Marine Corps Air Station New River, North Carolina. The CH-53K facility will provide a training space to... Read more

ILA 2014 – Tiger UHT and CH-53GA rack up flight hours

ILA 2014 – Tiger UHT and CH-53GA rack up flight hours

23-May-2014Source: Airbus Helicopters

Airbus Helicopters celebrated two important flight-hour milestones with the German Bundeswehr at ILA Berlin 2014. The German Bundeswehr has attained 10,000 flight hours with its Tiger UHT. As of today, 34 Tiger helicopters have been delivered to the German Armed Forces, 12 of them in ASGARD configuration for deployment in Afghanistan. In a separate ceremony,... Read more

Sikorsky officially unveils CH-53K as USMC reveals its name

Sikorsky officially unveils CH-53K as USMC reveals its name

8-May-2014Source: Sikorsky

Sikorsky Aircraft Corp., a subsidiary of United Technologies Corp. (NYSE: UTX), today officially unveiled the CH-53K heavy lift helicopter, the next generation in the CH-53 type series that the U.S. Marine Corps expects to begin operational service in 2019. During the rollout ceremony, attended by members of Congress, the Department of Defense, major suppliers to... Read more

Donaldson completes delivery of engine protection system for CH-53K

Donaldson completes delivery of engine protection system for CH-53K

6-May-2014Source: Donaldson

Donaldson Aerospace & Defense has completed delivering system development versions of its Engine Air Particle Protection System (EAPPS) to Sikorsky Aircraft Corporation’s CH-53K program that will provide the next-generation heavy-lift helicopter for the U.S. Marine Corps. The 12 Engineering Development Models delivered by Donaldson Aerospace & Defense, a division of Donaldson Company, Inc. (NYSE: DCI),... Read more

Sikorsky begins powered ground tests of CH-53K with rotor blades

Sikorsky begins powered ground tests of CH-53K with rotor blades

2-May-2014Source: Sikorsky

Sikorsky Aircraft Corp., a subsidiary of United Technologies Corp. (NYSE: UTX), has begun full system testing of the U.S. Marine Corps’ CH-53K heavy lift helicopter with all seven main rotor blades and four tail rotor blades attached for the first time to a non-flying prototype called the Ground Test Vehicle (GTV). Powered “Light-Off” with rotor... Read more

Sikorsky tests CH-53K for airframe structural strength

Sikorsky tests CH-53K for airframe structural strength

11-Apr-2014Source: Sikorsky

Sikorsky Aircraft Corp., a subsidiary of United Technologies Corp. (NYSE:UTX), has successfully completed an initial series of tests required by the Naval Air Systems Command to verify the structural strength of the CH-53K heavy lift helicopter. Conducted on a full-size non-flying airframe called the Static Test Article, the tests are part of a three-year program... Read more

US Marines increase presence in Australia

US Marines increase presence in Australia

28-Mar-2014Source: USMC

Service members at Marine Corps Air Station Kaneohe Bay departed here, March 25, to begin a six-month deployment to Australia’s Northern Territory as part of Marine Rotational Force – Darwin. Approximately 100 Marines from Marine Heavy Helicopter Squadron 463 (HMH-463) and Marine Aviation Logistics Squadron 24 (MALS-24), as well as four CH-53E Super Stallion helicopters... Read more

Sikorsky to review MH-53E engine fires

Sikorsky to review MH-53E engine fires

17-Mar-2014Source: HeliHub.com

A US Government website shows that the US Navy is to negotiate and award a sole source contract with Sikorsky for the procurement of non-recurring engineering tasks and deliverable products required for a trade study to reduce or eliminate the risk of inflight fires and heat damage in the #2 engine compartment as a result... Read more

General Electric win $80M contract for CH/MH-53 engine repairs

General Electric win $80M contract for CH/MH-53 engine repairs

10-Mar-2014Source: US DoD

General Electric, Lynn Mass., was awarded a $79,737,730 firm-fixed-price contract for the repair of 20 T-64 engine (CH53D/E and MH53E helicopters) components, along with manufacturing, engineering, and technical support to the Fleet Readiness Center East, Cherry Point, N.C., with a goal of improving monthly output.  Work will be performed in Cherry Point, N.C. (80 percent),... Read more

Exelis receives $34M contract for key CH-53K components

Exelis receives $34M contract for key CH-53K components

25-Feb-2014Source: Exelis

Exelis has been awarded a contract valued in excess of $34 million from Sikorsky to produce major structural airframe components for four production-representative CH-53K heavy lift helicopters . Designated as System Demonstration Test Articles (SDTA), the four aircraft will enable the U.S. Marine Corps to conduct operational evaluation of the new helicopter system beginning in 2017. Exelis will fabricate and... Read more

MH-53E Sea Dragon – Troubled past, uncertain future

MH-53E Sea Dragon – Troubled past, uncertain future

22-Feb-2014Source: Virginian Pilot

The US Navy have reportedly decided to develop a replacement to the MH-53E rather than invest a significant amount of money to keep the helicopters flying – see full story... Read more

Sikorsky powers up CH-53K Ground Test Vehicle

Sikorsky powers up CH-53K Ground Test Vehicle

11-Feb-2014Source: Sikorsky

Sikorsky Aircraft Corp., a subsidiary of United Technologies Corp. (NYSE:UTX), has powered up the engines and spun the rotor head on the first prototype CH-53K heavy lift helicopter — designated the Ground Test Vehicle (GTV). The January 24 event continues the “Bare Head Light Off” phase of testing — so named because it was conducted without rotor blades — that... Read more

Navy divers, sailors awarded for MH-53E recovery and salvage

Navy divers, sailors awarded for MH-53E recovery and salvage

10-Feb-2014Source: USMC

Adm. Bill Gortney, commander, U.S. Fleet Forces Command, presented awards to sailors and Navy Divers from Mobile Diving and Salvage Unit 2 (MDSU2) Feb. 6 for salvaging last month’s downed MH-53E helicopter and recovering a missing aviator. Gortney also congratulated MDSU2 on other recent mission highlights including salvaging a downed U.S. Air Force F-16C Falcon... Read more

08-Jan-14 Sikorsky MH-53E Virginia Beach, US-Virginia (3F)

08-Jan-14 Sikorsky MH-53E Virginia Beach, US-Virginia (3F)

8-Jan-2014

Crashed into the ocean.  Four of five POB rescued, but two of the four later died, named as pilot Lt. Wesley Van Dorn and Naval Aircrewman 3rd Class Brian Collins.  Search for fifth person – pilot  Lt. Sean Christopher Snyder – was later abandoned... Read more

HMH-772 flies toward aerial excellence

HMH-772 flies toward aerial excellence

5-Dec-2013Source: US Marine Corps

Since its inception, the Marine Corps has adapted to and overcome the numerous challenges and obstacles that have stood before it. And with highly capable units such as Marine Heavy Helicopter Squadron 772, the Marine Corps will conquer future obstacles as well. Commonly known as the “Hustlers,” HMH-772 is primarily stationed at Joint Base McGuire-Dix-Lakehurst... Read more

Sikorsky Completes Initial Tests of First CH-53K Rotor Blades

Sikorsky Completes Initial Tests of First CH-53K Rotor Blades

1-Nov-2013Source: Sikorsky

Sikorsky Aircraft has successfully completed the initial phase of testing for the first-ever main and tail rotor blades manufactured for the U.S. Marine Corps’ CH-53K heavy lift helicopter program. Designed specially to help meet the Marine Corps requirement to lift the aircraft’s maximum gross weight of 88,000 pounds, the all-composite blades are the largest and... Read more

HMH-461 welcomes new commanding officer

HMH-461 welcomes new commanding officer

29-Oct-2013Source: USMC

Lt. Col. Nicholas A. Morris relinquished command of Marine Heavy Helicopter Squadron (HMH) 461 to Lt. Col. Wade J. Dunford during a change of command ceremony at the HMH-461 flight line, Oct. 18. Morris’ first duty station was Marine Corps Air Station New River in 1997, where he served as a pilot for Marine Heavy... Read more

Pentagon withholds payments to Sikorsky for business system flaws

Pentagon withholds payments to Sikorsky for business system flaws

14-Oct-2013Source: Bloomberg

The 5% withholding is the maximum that can be temporarily docked from companies for shortcomings in a system to track cost and schedule performance, under regulations the Pentagon adopted in August 2012.  See full story... Read more

Kratos wins $8.5M contract for CH-53K Maintenance Training Systems

Kratos wins $8.5M contract for CH-53K Maintenance Training Systems

1-Oct-2013Source: Kratos

Kratos Defense & Security Solutions, Inc.KTOS +0.00% , a leading National Security Solutions provider, announced today that it has received from Sikorsky a contract award valued at over $8.5 million to design and develop maintenance training systems for the CH-53K heavy lift replacement helicopter. Kratos will provide a full-fidelity Maintenance Training Device Suite (MTDS), as well as... Read more

CPI Aero to build CH-53K structures for Spirit AeroSystems

CPI Aero to build CH-53K structures for Spirit AeroSystems

9-Sep-2013Source: CPI Aero

CPI Aerostructures, Inc. (CPI Aero(R)) (NYSE MKT:CVU) announced that it has been selected by Spirit AeroSystems, Inc. (Spirit) (NYSE: SPR) to manufacture structural assemblies for four CH-53K heavy lift helicopter System Demonstration Test Articles (SDTA). Spirit will produce the four additional SDTA cockpit and cabin components of the CH-53K for its prime contractor Sikorsky Aircraft... Read more

General Electric awarded $15M contract for CH-53K engine parts

General Electric awarded $15M contract for CH-53K engine parts

22-Jul-2013Source: US DoD

General Electric Co., Lynn, Mass., is being awarded a $15,691,247 cost-plus-fixed-fee contract for the procurement of time critical parts for incorporation into the T-408-GE-400 gas turbine engine in support of the CH-53K helicopter program.  Work will be performed in Lynn, Mass., and is expected to be completed in December 2016.  Fiscal 2013 research, development, test... Read more

Breeze-Eastern Wins $7 Million Order

Breeze-Eastern Wins $7 Million Order

18-Jul-2013Source: Breeze-Eastern

Breeze-Eastern Corp. (AMEX: BZC), the aerospace industry’s only dedicated hoist and winch manufacturer, has received a $7 million order from the U.S. Naval Supply Systems Command Weapons Support Unit to repair a range of cargo hooks and hoists for CH-53 helicopters. “Our team recognizes the importance of supporting this vital equipment with timely repairs, and... Read more

Increased CH-53K procurement “Not Justified” says auditor

Increased CH-53K procurement “Not Justified” says auditor

4-Jul-2013Source: Office of Inspector General

This report is the first in a series of reports evaluating Naval Air Systems Command acquisition management of the CH-53K program. We evaluated the CH-53K program documentation used to support the increased procurement quantity from 156 to 200 aircraft for the CH-53K program. What We Found The Marine Corps procurement quantity for CH-53K Heavy Lift... Read more

Spirit AeroSystems wins $60M contract for OpEval CH-53K work

Spirit AeroSystems wins $60M contract for OpEval CH-53K work

28-Jun-2013Source: Spirit AeroSystems

Spirit AeroSystems, Inc. (NYSE: SPR) has received a $60 million contract from Sikorsky Aircraft Corp. to supply the major structural cockpit and cabin components of four additional CH-53K heavy lift helicopters. Designated System Demonstration Test Articles (SDTA), the four production-representative aircraft will be used by the U.S. Marine Corps to evaluate the helicopter’s mission capabilities in service operating... Read more

Page 1 of 2

12

Copyright © 2024 HeliHub

Website by Design Inc

Helihub logo

X