24-May-2011
Situation reports covering the two-month mission show that at times, up to three of the six Griffons were unserviceable because of breakdowns, a lack of parts and inspections.   Another military post-operation report said the Griffons’ supply and movements system “for deployed operations is broken and needs to be fixed.”