17-May-2012 Source: Defense World
NHI Industries lists out 10 instances where the S70B could not have met the Naval Staff Quality Requirements (NSQRs). These include requirements for internal/external tanks, fuel reserve, sonar, health and usage monitoring system, deck lock and technical literature. (see full story)