RSS Feed for this search

Ah-64a

Timken awarded $46M three-year Apache transmission contract

Timken awarded $46M three-year Apache transmission contract

Timken Aerospace Transmissions LLC, Manchester, Connecticut, was awarded a $46,388,901 firm-fixed-price multi-year contract for the maintenance and overhaul of the Apache AH-64 A/D main transmission.  Bids were solicited via the Internet with three received, with an estimated completion date of Sept. 29, 2018. Funding and work location will be determined with each order. Army Contracting… Read more »

Source: US DoD, 01-Oct-15

US Army ‘retires’ last A model Apache helicopter

US Army ‘retires’ last A model Apache helicopter

It was a proud, historic and emotional moment for the Army and especially for the soldiers in the 1-149th Attack Reconnaissance Battalion. The last AH-64A Apache helicopter, aircraft 451, was “retired” from the Army and handed over to the Project Office for Apache Helicopters during a ceremony on Ellington Field Joint Reserve Base in Houston,… Read more »

Source: US Army, 18-Oct-12

HeliHub.com advertising space - 240x100 Pixels
Visit our website - www.sloanehelicopters.com

US Army ‘retires’ last A model Apache

US Army ‘retires’ last A model Apache

It was a proud, historic and emotional moment for the Army and especially for the soldiers in the 1-149th Attack Reconnaissance Battalion. The last AH-64A Apache helicopter, aircraft 451, was “retired” from the Army and handed over to the Project Office for Apache Helicopters during a ceremony on Ellington Field Joint Reserve Base in Houston,… Read more »

Source: US Army, 20-Jul-12