US Army

20-Apr-21 (serial TBC) Airbus UH-72A New Brockton, US-Alabama

20-Apr-21 (serial TBC) Airbus UH-72A New Brockton, US-Alabama

20-Apr-2021

Training accident, further details awaited.  Two POB both to hospital... Read more

Sikorsky demos S-97 Raider for Future Vertical Lift program

Sikorsky demos S-97 Raider for Future Vertical Lift program

16-Apr-2021

Flying low, fast and expertly executing crisp, tight, quick maneuvers that only Sikorsky’s X2 Technology™ family of helicopters brings, the Sikorsky S-97 RAIDER® helicopter flew two demonstrations before Army officials and Soldiers at Redstone Arsenal in Huntsville, Alabama this week. The events offered a glimpse at Sikorsky, a Lockheed Martin company’s bid for the Future... Read more

Sikorsky awarded $94M contract to support HH-60M

Sikorsky awarded $94M contract to support HH-60M

8-Apr-2021Source: US DoD

Sikorsky Aircraft Corp., Stratford, Connecticut, was awarded a $94,278,532 modification (P00180) to contract W58RGZ-17-C-0009 to support an option exercise of six Program Year 5, Lot 45 HH-60M aircraft. Work will be performed in Stratford, Connecticut, with an estimated completion date of July 31, 2022. Fiscal 2021 aircraft procurement, Army funds in the amount of $94,278,532... Read more

Sikorsky awarded $30M more on US Army order for 24 UH-60s

Sikorsky awarded $30M more on US Army order for 24 UH-60s

8-Apr-2021Source: US DoD

Sikorsky Aircraft Corp., Stratford, Connecticut, was awarded a $30,959,224 modification (P00181) to contract W58RGZ-17-C-0009 for procurement of nine Army UH-60M and 15 Army HH-60M aircraft. Work will be performed in Stratford, Connecticut, with an estimated completion date of June 30, 2023. Fiscal 2021 aircraft procurement, Army funds in the amount of $30,959,224 were obligated at... Read more

Bell and US Army advance development of V-280 Valor

Bell and US Army advance development of V-280 Valor

6-Apr-2021Source: Bell

Bell Textron Inc., a Textron Inc. (NYSE: TXT) company and the U.S. Army have agreed to terms on the execution of the second phase of the Competitive Demonstration and Risk Reduction (CD&RR) contract that was awarded in March 2020 for the Future Long-Range Assault Aircraft (FLRAA) program. This new contract is an important milestone and... Read more

Uncertain outlook for Chinook puts 18,000 jobs at risk

Uncertain outlook for Chinook puts 18,000 jobs at risk

26-Mar-2021Source: Forbes

The U.S. Army only has one type of heavy-lift helicopter. It is called the CH-47F Chinook, and it’s expected to remain in service until around 2060. See Full Story.... Read more

Honeywell awarded $476M Chinook engine contract

Honeywell awarded $476M Chinook engine contract

11-Mar-2021Source: Honeywell

Honeywell (NYSE: HON) has won a 4-year IDIQ (Indefinite Delivery, Indefinite Quantity) contract for new production and spare T55-GA-714A engines that power the U.S. Army’s CH-47 Chinook helicopters. This $476 million contract award will ensure that the U.S. Army’s Chinook fleet has spare engines to support future missions and available engines for Boeing’s Philadelphia Production... Read more

Sikorsky awarded $53M contract for four UH-60Ms

Sikorsky awarded $53M contract for four UH-60Ms

3-Mar-2021Source: US DoD

Sikorsky Aircraft Corp., Stratford, Connecticut, was awarded a $53,869,392 modification (P00178) to contract W58RGZ-17-C-0009 for four UH-60M aircraft. Work will be performed in Stratford, Connecticut, with an estimated completion date of June 30, 2022. Fiscal 2010 special funds in the amount of $53,869,392 were obligated at the time of the award. U.S. Army Contracting Command,... Read more

US Army tests UH-60 Load Stability System Litter Attachment from Vita Inclinata

US Army tests UH-60 Load Stability System Litter Attachment from Vita Inclinata

26-Feb-2021Source: Vita Inclinata

The U.S. Army Aeromedical Research Laboratory (USAARL) and Vita Inclinata announced that the USAARL successfully completed initial prototype flight-testing on Vita’s Load Stability System Litter Attachment (LSS-LA) at Fort Rucker, in support of Cooperative Research and Development Agreement W81XWH-19-0115 and in preparation for Project Convergence 21, the military’s initiative to modernize and transform its operations, which includes future hoist... Read more

SAFE wins contract for US Army UH-60 work platforms

SAFE wins contract for US Army UH-60 work platforms

26-Feb-2021Source: S.A.F.E. Structure Designs

S.A.F.E. Structure Designs is pleased to announce the contract for custom work platforms for the US Army fleet of UH-60’s at the Yuma Proving Grounds in Tucson, AZ.  These SAFETY FIRST ergonomic maintenance stands are custom designed for the United States Army’s UH-60.  They are uniquely developed to fit and function in the tight-spaced hangar... Read more

DynCorp Awarded UH-60 Contractor Logistics Support Services Task Order

DynCorp Awarded UH-60 Contractor Logistics Support Services Task Order

19-Feb-2021Source: DynCorp

 On Dec. 15, the Army Contracting Command, Redstone Arsenal, Alabama, awarded DynCorp International (DI) a task order to provide UH-60 Contractor Logistics Support (CLS) under the Worldwide Logistics Support Services – Contractor Logistics Support (WLSS-C) multiple award IDIQ. This task order, valued at $554.1 million if all options are exercised, consists of a six-year period... Read more

US Army is developing the vertical flight workforce

US Army is developing the vertical flight workforce

15-Feb-2021Source: US Army

The U.S. Army is developing technical skills for student aviation researchers with a new agreement between its corporate laboratory and an aviation society. Both organizations hope to advance electric vertical takeoff and landing and advanced air mobility technology. The U.S. Army Combat Capabilities Development Command, now known as DEVCOM, Army Research Laboratory and the Vertical... Read more

Viasat demos through-blade BLOS Ka-band SatCom to US Army UH-60M

Viasat demos through-blade BLOS Ka-band SatCom to US Army UH-60M

11-Feb-2021Source: Viasat

Viasat Inc. (NASDAQ: VSAT), a global communications company, announced it successfully demonstrated through-the-blades Beyond Line of Sight (BLOS) Ka-band satellite communications (SATCOM) connectivity to a U.S. Army UH-60M rotary-wing helicopter. The demonstration highlighted Viasat’s ability to deliver resilient command and control (C2) communications, feature-rich situational awareness (SA) and Intelligence Surveillance and Reconnaissance (ISR) feeds –... Read more

02-Feb-21 (tba) Sikorsky UH-60 Lucky Peak, US-Idaho (3F)

02-Feb-21 (tba) Sikorsky UH-60 Lucky Peak, US-Idaho (3F)

2-Feb-2021

Night training mission in a routinely used area.  In a press conference (video, 7m50s) Lt. Col. Nicole Washington noted that the weather was poor, with snow and a low ceiling of fog that affected both the subject flight and later search efforts for the victims.  The Guard named those on board as Chief Warrant Officer 4 Jesse Anderson,... Read more

Sikorsky and Boeing update Defiant X for US Army FLRAA bid

Sikorsky and Boeing update Defiant X for US Army FLRAA bid

27-Jan-2021Source: Sikorsky

Sikorsky, a Lockheed Martin Company (NYSE: LMT), and Boeing (NYSE: BA) released details of its advanced helicopter for the U.S. Army’s Future Long-Range Assault Aircraft competition, known as FLRAA. The aircraft, named DEFIANT X, will be the fastest, most maneuverable and most survivable assault helicopter in history. Combined with the team’s unsurpassed experience in mission... Read more

US helicopters conduct unique training with Greek military

US helicopters conduct unique training with Greek military

21-Jan-2021Source: US Army

  The U.S. Army’s 1st Battalion, 101st Combat Aviation Brigade (CAB), 101st Airborne Division (Air Assault), together with Hellenic Armed Forces, executed Eddie’s Odyssey, a first of its kind, joint training mission on Velopoula Island and over the Aegean Sea, Jan. 13-14. The exercise, named after Ugly Eddie, the battalion mascot, consisted of U.S. AH-64E... Read more

Container Research Corp wins V-22 aux tank contract

Container Research Corp wins V-22 aux tank contract

15-Jan-2021Source: US DoD

Container Research Corp.,* Aston, Pennsylvania, is awarded an $11,539,383 firm-fixed-price, indefinite-delivery/indefinite-quantity contract.  This contract provides for the procurement of up to a maximum quantity of 275 V-22 Mission Auxiliary Tank System storage containers for the Navy, Marines, Air Force and Foreign Military Sales customers.  Work will be performed in Aston, Pennsylvania, and is expected to... Read more

US Army requests funding for Rescue Litter Stabilization System

US Army requests funding for Rescue Litter Stabilization System

14-Jan-2021Source: Vita Inclinata

There are two notable firsts in the 2021 defense bill, which will help the US Army reduce accidents, save lives and precisely deliver sensitive payloads:  Load Stability System – Litter Attachment (LSS-LA) initial safety of flight prototype testing on HH-60M photos by Scott C Childress. The appearance of U.S. Department of Defense (DoD) visual information... Read more

Boeing marks 35 years of Field Reps with US Army Apaches

Boeing marks 35 years of Field Reps with US Army Apaches

7-Jan-2021Source: Boeing

Boeing’s [NYSE: BA] latest contract from the U.S. Army continues to build on a legacy of customer field support for the Army’s AH-64 Apache. Under the projected five-year, $83.3 million max indefinite delivery, indefinite quantity agreement, 15 Boeing field service representatives will be dedicated to the U.S. Army’s Apache fleet. Boeing has provided field service... Read more

US Army commissions unique lab for advanced helicopter transmissions

US Army commissions unique lab for advanced helicopter transmissions

23-Dec-2020Source: US Army

The U.S. Army will commission its Vehicle Innovative Powertrain Experimental Research laboratory later this month and begin operations in early January. Researchers at the U.S. Army Combat Capabilities Development Command, now known as DEVCOM, Army Research Laboratory, will launch the VIPER lab to deliver transformational knowledge to advance next-generation rotorcraft transmissions. The Army-unique facility will... Read more

CAE win $90M US Army training contract

CAE win $90M US Army training contract

23-Dec-2020Source: CAE

CAE announced that CAE USA is authorized to proceed on the United States Army contract to provide advanced helicopter flight training support services. Under terms of the contract, CAE USA will provide classroom, simulator, and live flying instructor support services for Army aviators training to fly the CH-47 Chinook, UH-60 Black Hawk, and AH-64 Apache... Read more

Bell’s Program Execution Builds Confidence in V-280 Valor for US Army FLRAA Competition

Bell’s Program Execution Builds Confidence in V-280 Valor for US Army FLRAA Competition

22-Dec-2020Source: Bell

Bell Textron Inc., a Textron Inc. (NYSE: TXT) company, and Team Valor celebrated the three-year anniversary of the V-280 Valor’s first flight. Since that first flight, the V-280 team has executed a rigorous flight test program flying 200 hours through over 150 individual test flights. The test program was designed to demonstrate Bell-defined key performance parameters... Read more

Invention may get US Army quadcopters to move faster

Invention may get US Army quadcopters to move faster

18-Dec-2020Source: US Army

Researchers believe a new hinge is the key to get load-bearing, large, Army quadrotors to climb a few dozen feet in seconds. Dr. Jean-Paul Reddinger, a research aerospace engineer with the U.S. Army Combat Capabilities Development Command, now known as DEVCOM, Army Research Laboratory, is studying how quickly a quadrotor the size of a king-sized... Read more

KBR wins $49M contract to boost reliability of US Army CH-47 fleet

KBR wins $49M contract to boost reliability of US Army CH-47 fleet

18-Dec-2020Source: KBR

KBR (NYSE: KBR) won a $49 million recompete to provide system acquisition support and reliability improvements on the CH-47 Chinook Helicopter and other select aircraft for the Cargo Helicopter Project Management Office (PMO) within the U.S. Army’s Program Executive Office (PEO) Aviation. KBR received this cost-plus-fixed-fee task order via the Department of Defense Information Analysis... Read more

Sikorsky awarded $507M contract for UH-60M HH-60M aircraft

Sikorsky awarded $507M contract for UH-60M HH-60M aircraft

18-Dec-2020Source: US DoD

Sikorksy Aircraft Corp., Stratford, Connecticut, was awarded a $507,036,949 modification (P00163) to contract W58RGZ-17-C-0009 for UH-60M HH-60M aircraft.  Work will be performed in Stratford, Connecticut, with an estimated completion date of June 30, 2022.  Fiscal 2021 aircraft procurement (Army) funds in the amount of $507,036,949 were obligated at the time of the award.  The U.S.... Read more

Boeing awarded $13M contract for software upgrades to the flight management computer of AH-64E

Boeing awarded $13M contract for software upgrades to the flight management computer of AH-64E

18-Dec-2020Source: US DoD

The Boeing Co., Mesa, Arizona, was awarded a $13,900,000 modification (P00066) to contract W58RGZ-16-C-0023 for software upgrades to the flight management computer for the AH-64E.  Work will be performed in Mesa, Arizona, with an estimated completion date of Dec. 31, 2024.  Fiscal 2020 aircraft procurement (Army) funds in the amount of $2,780,000 were obligated at... Read more

Wind tunnel tests will help design future Army tiltrotor aircraft

Wind tunnel tests will help design future Army tiltrotor aircraft

11-Dec-2020Source: US Army

After more than three years in development, a team of U.S. Army researchers and industry partners completed the construction of a testbed that will help to inform the design of future Army rotorcraft. The team plans to test the TiltRotor Aeroelastic Stability Testbed, or TRAST in a massive wind tunnel at the NASA Langley Research... Read more

US Army studies eVTOL acoustics in the quest for silent helicopters

US Army studies eVTOL acoustics in the quest for silent helicopters

4-Dec-2020Source: New Atlas

The US Army is working to better understand the acoustic properties of eVTOL aircraft and co-axial rotors as part of efforts to design quieter, stealthier helicopters.... Read more

MD Helicopters Secures $34 Million Army Contract

MD Helicopters Secures $34 Million Army Contract

4-Dec-2020Source: MD Helicopters

MD Helicopters, Inc. (MDHI) announces an agreement with the U.S. Army worth about $34 million to provide logistics support for the Afghanistan Air Force MD 530F Cayuse Warrior light attack and reconnaissance helicopter fleet. The deal is a continuation of MDHI’s contractor logistics support (CLS) with the U.S. Army and Multi-National Aviation Special Project Office (MASPO)... Read more

ITT Enidine selected as partner for Bell 360 program

ITT Enidine selected as partner for Bell 360 program

3-Dec-2020Source: ITT Enidine

ITT Inc.’s (NYSE: ITT) Enidine brand announces its teaming arrangement with leading aerospace manufacturer Bell Textron Inc., a Textron Inc. (NYSE: TXT) company, to produce passive vibration control technology for the Bell 360 Invictus. Enidine joins eight other elite aerospace teammates in Bell’s mission to submit the Bell 360 competitive prototype to the U.S. Army’s... Read more

Elbit win $96M Contract for a Rotary-Wing Mission Training Center

Elbit win $96M Contract for a Rotary-Wing Mission Training Center

1-Dec-2020Source: Elbit Systems

Elbit Systems Ltd. (NASDAQ: ESLT, TASE: ESLT) (“Elbit Systems” or “the Company”) announced that it was awarded a contract valued at approximately $96 million to supply a European country with a Rotary-Wing Mission Training Center (“Rotary-Wing MTC”) and support services to train its Air Force, Army and Navy helicopter pilots and crews. The contract will... Read more

Sikorsky awarded $47M contract for UH-60M

Sikorsky awarded $47M contract for UH-60M

5-Nov-2020Source: US DoD

Sikorsky Aircraft Corp., Stratford, Connecticut, was awarded a $47,970,000 modification (P00150) to contract W58RGZ-17-C-0009 for UH-60M aircraft.  Work will be performed in Stratford, Connecticut, with an estimated completion date of Dec. 30, 2022.  Fiscal 2020 operation and maintenance (Army) funds in the amount of $5,000,000 were obligated at the time of the award.  The U.S.... Read more

BAE Systems to deliver autonomy capabilities for FVL program

BAE Systems to deliver autonomy capabilities for FVL program

5-Nov-2020Source: BAE Systems

BAE Systems has been awarded multiple contracts from the U.S. Army to develop key technologies for the Advanced Teaming Demonstration Program (A-Team). BAE Systems was the only company awarded contracts for three of the program’s four focus areas, designed to advance manned and unmanned teaming (MUM-T) capabilities that are expected to be critical components in... Read more

Sikorsky awarded $13M contract for UH-60M Black Hawk

Sikorsky awarded $13M contract for UH-60M Black Hawk

23-Oct-2020Source: US DoD

Sikorsky Aircraft Corp., Stratford, Connecticut, was awarded a $13,739,845 modification (P00152) to contract W58RGZ-17-C-0009 for one UH-60M Black Hawk helicopter.  Work will be performed in Stratford, Connecticut, with an estimated completion date of Nov. 30, 2020.  Fiscal 2010 Foreign Military Sales (Jordan) funds in the amount of $13,739,845 were obligated at the time of the... Read more

Longbow awarded $32M contract for spare parts kits for AH-64E

Longbow awarded $32M contract for spare parts kits for AH-64E

16-Oct-2020Source: US DoD

Longbow Ltd., Orlando, Florida, was awarded a $32,154,552 modification (P00001) to contract W58RGZ-20-F-0464 for generic spare parts kits for AH-64E Apache helicopters.  Work will be performed in Orlando, Florida, with an estimated completion date of April 30, 2024.  Fiscal 2020 Foreign Military Sales (India, Morocco, Netherlands, and United Arab Emirates) funds in the amount of... Read more

Honeywell Secures Repair and Overhaul Contract for US Army Chinook Fleet

Honeywell Secures Repair and Overhaul Contract for US Army Chinook Fleet

13-Oct-2020Source: Honeywell

Honeywell (NYSE: HON) has won a five-year IDIQ (Indefinite Delivery, Indefinite Quantity) contract for the repair and overhaul of its T55-GA-714A engines that operate on the U.S. Army’s CH-47 Chinook helicopters. This contract award will ensure that the U.S. Army’s Chinook fleet has spare engines to sustain its future missions and overall readiness. The engines... Read more

GE T901 engine ahead of schedule

GE T901 engine ahead of schedule

13-Oct-2020Source: GE Aviation

GE Aviation, in cooperation with the United States Army, successfully completed the Critical Design Review (CDR) in July for the T901-GE-900, GE’s next-generation engine that will power a large portion of the Army’s rotorcraft fleet for decades to come. In 2019, the U.S. Army selected GE Aviation’s T901 engine for the Engineering and Manufacturing Development... Read more

Elbit Systems of America wins $50M contract in support of US Army NVIS

Elbit Systems of America wins $50M contract in support of US Army NVIS

7-Oct-2020Source: Elbit Systems

Elbit Systems Ltd. (NASDAQ: ESLT, TASE: ESLT) (“Elbit Systems”) announced that its U.S. subsidiary, Elbit Systems of America, LLC (“Elbit Systems of America”), was awarded an Indefinite Delivery/Indefinite-Quantity (ID/IQ) contract with a maximum value of approximately $50 million to produce spare parts in support of the Aviators’ Night Vision Imaging System Head-Up Display system (“ANVIS... Read more

Wisconsin National Guard UH-60 Black Hawk aircrews hold training at Fort McCoy

Wisconsin National Guard UH-60 Black Hawk aircrews hold training at Fort McCoy

11-Sep-2020Source: US Army

Aircrews with the 1st Battalion, 147th Aviation Regiment Wisconsin National Guard at Madison operated several UH-60 Black Hawk helicopters Aug. 13 at Fort McCoy, Wis., as part of annual training at the post. Members of the unit regularly complete training operations at Fort McCoy and the unit also supports numerous training events at the installation... Read more

CH-53K tests its power at US Army Yuma Proving Ground

CH-53K tests its power at US Army Yuma Proving Ground

11-Sep-2020Source: US Army

The CH-53 has been a potent member of the Marine Corps aviation community’s fleet for over 40 years, but the newest version takes the platform to a whole new level. Equipped with three 7,500 horsepower engines and built to carry a nearly 30,000 pound external load for over 100 miles, the CH 53K King Stallion... Read more

Air Methods extends contract with US Army Garrison Fort Hunter Liggett

Air Methods extends contract with US Army Garrison Fort Hunter Liggett

9-Sep-2020Source: Air Methods

Air Methods, a leading air medical service in the U.S., and U.S. Army Garrison Fort Hunter Liggett, the military’s premier Total Force Training Center and the U.S. Army Reserve’s largest training installation, announced today that they have renewed their long-standing relationship, which has been in place since 2011. The agreement guarantees a continued relationship for... Read more

US Army issues new policy to address 3D printed parts

US Army issues new policy to address 3D printed parts

9-Sep-2020Source: US Army

As the Army explores the potential of some advanced manufacturing methods and 3D-printed parts to maintain and sustain its aviation fleet, recently published guidance aims to strike a balance between safety, improvements to readiness and escalating costs. Advanced manufacturing refers to new ways of making existing products and the production of new products using advances... Read more

Airbus introduces UH-72B based on H145 with fenestron

Airbus introduces UH-72B based on H145 with fenestron

2-Sep-2020Source: Airbus Helicopters

Airbus Helicopters, Inc. will introduce the newest series of its Lakota helicopter to the U.S. Army’s fleet, the company announced today at the 2020 National Guard Association of the United States (NGAUS) virtual tradeshow. Starting with new orders placed this year for 17 additional Lakota helicopters, the U.S. Army will welcome the newest series –... Read more

AT Systems starts Airworthiness process with US Army Aeromedical Research Laboratory

AT Systems starts Airworthiness process with US Army Aeromedical Research Laboratory

27-Aug-2020Source: AT Systems

AT Systems, LLC is proud to announce the start of the Airworthiness Release Process (AWR) as a part of the Cooperative Research and Development Agreement (CRADA) with the US Army Aeromedical Laboratory (USAARL) at Fort Rucker, AL. AT Systems has patented a device that trains pilots for degraded visual environment during normal training flights. This... Read more

SAFE delivers AH64 cowling racks to US Army Fort Hood

SAFE delivers AH64 cowling racks to US Army Fort Hood

27-Aug-2020Source: S.A.F.E. Structure Designs

S.A.F.E. Structure Designs is pleased announce they have delivered 7 custom cowling racks for the scheduled preventive maintenance inspections of the AH64 to the US Army, Fort Hood. The custom designed racks are part of the ongoing US Army / S.A.F.E. project to redesign the maintenance hangar to be more ergonomic and efficient. The custom... Read more

27-Aug-20 ??-????? Sikorsky MH-60M San Clemente Island, US-California (2F)

27-Aug-20 ??-????? Sikorsky MH-60M San Clemente Island, US-California (2F)

27-Aug-2020

US special forces UH-60M crashed with two fatalities and three injuries. Two fatalities were named as Staff Sgt. Vincent Marketta, 33, and Sgt. Tyler Shelton, 22... Read more

Netherlands’ Chinook purchase strengthens US-Coalition capabilities

Netherlands’ Chinook purchase strengthens US-Coalition capabilities

14-Aug-2020Source: US Army

The spring 2020 delivery of CH-47F Chinooks and other materiel and services to the Royal Netherlands Air Force is a critical step in deterring regional threats and strengthening U.S.-Coalition capabilities. The Netherlands purchased the U.S. military’s twin-engine heavy-lift helicopters through a $755M foreign military sales (FMS) case executed by Redstone Arsenal’s U.S. Army Security Assistance... Read more

Boeing Receives $265 Million Chinook Helicopter Order

Boeing Receives $265 Million Chinook Helicopter Order

7-Aug-2020Source: Boeing

Boeing [NYSE: BA] recently signed a $265 million contract for nine more MH-47G Block II Chinook helicopters that employees in its Philadelphia plant will assemble for the U.S. Army Special Operations Aviation Command (USASOAC). Boeing is now on contract for 24 of the next-generation Chinooks. The MH-47G Block II Chinook features an improved structure and... Read more

Boeing Delivers 2,500th AH-64 Apache

Boeing Delivers 2,500th AH-64 Apache

28-Jul-2020Source: Boeing

Boeing [NYSE: BA] recently delivered its 2,500th AH-64 Apache helicopter, an E-model Apache for the U.S. Army, from the company’s production line in Mesa, Arizona. The first production AH-64, an A-model Apache, rolled off the assembly line on September 30, 1983, and was delivered by Boeing heritage company McDonnell Douglas to the U.S. Army in... Read more

Honeywell and US Army to demo next-gen T55 Chinook engine

Honeywell and US Army to demo next-gen T55 Chinook engine

8-Jun-2020Source: Honeywell

Honeywell (NYSE: HON) has entered into an agreement with the U.S. Army to demonstrate and fly its upgraded T55 engine on the heavy-lift, twin-engine Chinook helicopter. The new 6,000-horespower engine is 25% more powerful and consumes 10% less fuel than the current T55. New modifications also make the next-generation T55 easier to maintain with lower... Read more

US Army test launches UAS from Black Hawk

US Army test launches UAS from Black Hawk

22-May-2020Source: US Army

Dozens of sets of eyes looked skyward at Yuma Proving Ground, Arizona, in early March to watch the forward launch of an unmanned aircraft system from a helicopter and from a moving vehicle on the ground. “This may seem like just another event – like ‘well, we’ve done another experiment, we’ve done another demonstration’ –... Read more

High tech breathes new life into aging helicopter fleet

High tech breathes new life into aging helicopter fleet

1-May-2020Source: US Army

The Army is turning to “digital-twin” technology to resolve challenges and boost efficiencies for its enduring fleet of Black Hawk helicopters. As a first step in this endeavor, an operational Black Hawk helicopter and a separate fuselage began an 800-mile journey Tuesday from Corpus Christi Army Depot in Texas to Wichita, Kansas. Through a partnership... Read more

Training expands to meet need for US Army Apache pilots

Training expands to meet need for US Army Apache pilots

28-Apr-2020Source: US Army

The Army has found a viable alternative to assist Fort Rucker in the training of D model Apache instructor pilots and maintenance test pilots. The last D model IP/MTP courses at Fort Rucker ended in early April, which meant D model IPs/MTPs would have to be taught another way. Among those that needed training were... Read more

US Navy Surface Forces and Army Attack Helicopters Conduct Integration Operations in Arabian Gulf

US Navy Surface Forces and Army Attack Helicopters Conduct Integration Operations in Arabian Gulf

22-Apr-2020Source: US Naval Forces Central Command

U.S. Navy Expeditionary Landing Base ship USS Lewis B. Puller (ESB 3), assigned to U.S. Naval Forces Central Command (USNAVCENT), has been conducting joint naval and air integration operations with U.S. Army AH-64E Apache attack helicopters assigned to U.S. Army Central Command’s (USARCENT) Task Force Saber, throughout the month of March. The operations, which are... Read more

Boeing Delivers 500th AH-64E Apache

Boeing Delivers 500th AH-64E Apache

17-Apr-2020Source: Boeing

Production, flight test and deliveries of the AH-64E Apache helicopter continue at the Boeing [NYSE: BA] site in Mesa, Arizona. With 500 AH-64E Apaches in service with the United States Army and defense forces around the world, the ‘Echo’ model provides enhanced performance; joint digital interoperability; situational awareness and survivability with reduced operational and support... Read more

Bell 360 Invictus chosen for US Army Scout Rotorcraft Competition

Bell 360 Invictus chosen for US Army Scout Rotorcraft Competition

3-Apr-2020Source: Bell

Bell Textron Inc., a Textron Inc. (NYSE: TXT) company, has been selected to continue its work on the U.S. Army’s Future Attack Reconnaissance Aircraft (FARA) program. As part of the selection, Bell is designing, manufacturing, and testing the Bell 360 Invictus, a prototype rotorcraft designed to provide improved lethality, survivability, and extended reach for Army... Read more

US Army contract awarded Bell for competitive demonstration and risk reduction

US Army contract awarded Bell for competitive demonstration and risk reduction

19-Mar-2020Source: Bell

Bell Textron Inc., a Textron Inc. (NYSE: TXT) company, has been selected as a project agreement holder for the competitive demonstration and risk reduction (CD&RR) effort as part of the U.S. Army’s Future Long Range Assault Aircraft (FLRAA) program. Under the agreement Bell will deliver a refined V-280 Valor design, with supporting technical documentation, that... Read more

COVID-19 – Quad-A cancelled

COVID-19 – Quad-A cancelled

16-Mar-2020Source: AAAA

Dear Participants, We have decided we must cancel our April 2020 AAAA Nashville based Mission Summit. We will be looking at options in the coming weeks for AAAA to support expanded networking opportunities later this year at our other longstanding annual events. In view of yesterday afternoon’s Memorandum from the Director of the Army Staff,... Read more

New head at US Army Program Executive Office for Aviation

New head at US Army Program Executive Office for Aviation

4-Feb-2020Source: US Army

The Program Executive Office for Aviation held a change of charter Jan. 14 at the Redstone Test Center hangar to commemorate Maj. Gen. Thomas Todd transferring his responsibilities as the program executive officer to Patrick Mason. “I can’t begin to say what an absolute honor and privilege it is for me to serve with the... Read more

Follow-on Testing for LONGBOW Fire Control Radar Successful

Follow-on Testing for LONGBOW Fire Control Radar Successful

18-Nov-2019Source: Lockheed Martin

The LONGBOW Limited Liability Company, a joint venture of Northrop Grumman Corporation (NYSE: NOC) and Lockheed Martin (NYSE: LMT), announced the successful completion of the Army’s AH-64E Apache Follow-On Test and Evaluation II (FOT&E II) for the AN/APG-78 LONGBOW Fire Control Radar (FCR). During the FOT&E, the modernized LONGBOW FCR successfully demonstrated many new operational... Read more

US Army to buy 31 simulators from Ryan Aerospace

US Army to buy 31 simulators from Ryan Aerospace

11-Nov-2019Source: Ryan Aerospace

Ryan Aerospace (Australia) has been awarded a contract to supply more than 30 HELIMOD Mark III helicopter simulators for the US Army at Fort Rucker, Alabama – the world’s largest helicopter training facility.  The contract is part of the Army’s “Aviator Training Next” or “ATN” Program, an experimental, yet innovative, new way to provide helicopter... Read more

Air Center signs HCare Smart contract for Airbus H225 fleet

Air Center signs HCare Smart contract for Airbus H225 fleet

4-Nov-2019Source: Airbus Helicopters

Air Center Helicopters, Inc (ACHI) has signed a set of HCare Smart parts-by-the-hour contracts for 10 of its Airbus H225 helicopters. These aircraft are currently in operation with the U.S. Armed Forces for passenger transport, Special Operations Forces training, vertical replenishment and casualty evacuation missions. The HCare Smart contracts cover a three-year period and have been customized to meet the material support and spare parts requirements... Read more

Lockheed Martin to produce M-TUR for AH-64E Apache

Lockheed Martin to produce M-TUR for AH-64E Apache

25-Oct-2019Source: Lockheed Martin

The U.S. Army recently awarded Lockheed Martin (NYSE: LMT) a $40.6 million contract to produce Modernized Turrets (M-TUR) for the AH-64E Apache helicopter, an upgrade to the Modernized Target Acquisition Designation Sight and Pilot Night Vision Sensor (M-TADS/PNVS) system with enhanced operational and performance capabilities. The eyes of the Apache are getting an upgrade that... Read more

Safety message extends lifecycle for Black Hawk parts

Safety message extends lifecycle for Black Hawk parts

24-Oct-2019Source: US Army

Recent guidance from the U.S. Army Aviation and Missile Command breathes additional life into several dynamic components of the Black Hawk helicopter, ultimately improving readiness for the workhorse of Army aviation. An AMCOM safety message dated Sept. 9, updated the time to change out or retire more than 20 parts, increasing component time for aircraft... Read more

Sikorsky Introduces RAIDER X™

Sikorsky Introduces RAIDER X™

15-Oct-2019Source: Sikorsky

Sikorsky, a Lockheed Martin company (NYSE: LMT), introduced RAIDER X™, its concept for an agile, lethal and survivable compound coaxial helicopter, specifically designed for securing vertical lift dominance against evolving peer and near-peer threats on the future battlefield. Through the U.S. Army’s Future Attack Reconnaissance Aircraft (FARA) program, RAIDER X is the out-front platform in... Read more

US Army trialing new helicopter pilot training program

US Army trialing new helicopter pilot training program

15-Oct-2019Source: US Army

With inspiration from Leonardo da Vinci, the 23rd Flying Training Squadron here is transforming the learning environment with the intent of developing vertical-lift aviators better trained and prepared to conduct homeland security, combat search and rescue, and special operations missions. The first six students to complete the experimental specialized undergraduate pilot training – helicopter curriculum... Read more

NFAC tests next-generation military helicopter

NFAC tests next-generation military helicopter

15-Oct-2019Source: Arnold Air Force Base

The U.S. Army is looking to improve its aviation technology and recently called upon the AEDC National Full-Scale Aerodynamics Complex at Moffett Field in Mountain View, California, to advance this effort. Engineers from Sikorsky Aircraft Corporation and The Boeing Company, in partnership with the U.S. Army Combat Capabilities Development Command Aviation & Missile Center Army... Read more

Bell introduces B360 Invictus for US Army FARA Competitive Prototype

Bell introduces B360 Invictus for US Army FARA Competitive Prototype

3-Oct-2019Source: Bell

Bell Textron Inc., a Textron Inc. (NYSE: TXT) company, has announced a new rotorcraft, Bell 360 Invictus, as the company’s entrant for the U.S. Army’s Future Attack Reconnaissance Aircraft (FARA) Competitive Prototype program. Bell’s innovative approach to designing the Bell 360 Invictus combines proven low-risk technologies with advanced processes to deliver soldiers an affordable, agile and... Read more

Bell teams with Collins for US Army FARA program

Bell teams with Collins for US Army FARA program

2-Oct-2019Source: Bell

Bell Textron Inc., a Textron Inc. (NYSE: TXT) company, announced a teaming agreement with Collins Aerospace Systems, a unit of United Technologies Corp. (NYSE: UTX), as Bell competes for the U.S. Army’s Future Attack Reconnaissance Aircraft (FARA) Competitive Prototype program. Bell is designing a vertical lift aircraft, as part of the contract awarded in April... Read more

US Army starts testing UH-60V Black Hawk helicopter digital cockpit

US Army starts testing UH-60V Black Hawk helicopter digital cockpit

30-Sep-2019Source: US Army

Combat aviators here are conducting operational tests of Army modernization efforts using three UH-60V Black Hawk helicopters. The UH-60V Black Hawk will retrofit the Army’s remaining UH-60L helicopter fleet’s analog cockpits with a digital cockpit, similar to the UH-60M helicopter. Retrofitting aircraft that are already owned by the Army is a major cost saving measure... Read more

Kopin Advanced Color LCD Microdisplay Designed in Pilot HMDs for US Army

Kopin Advanced Color LCD Microdisplay Designed in Pilot HMDs for US Army

11-Sep-2019Source: Kopin

Kopin® Corporation (NASDAQ: KOPN), a U.S. developer of display systems for wearable technologies and military applications,  announced its super high-performance Brillian liquid crystal display (LCD) has been designed into a customer’s helmet-mounted display (HMD) system for the US Army’s helicopter pilots. The Brillian display incorporates advanced designs and processing techniques to produce unsurpassed image performance... Read more

US sends 60 training helicopters to Colombia

US sends 60 training helicopters to Colombia

11-Sep-2019Source: US Army Security Assistance Command

Fighting illegal drug trafficking is done to safeguard national security, and this fight is supported by security assistance programs executed for the Army by Security Assistance Command. USASAC has used one such program, Section 333, to transfer 60 TH-67 Training Bell Model helicopters to the Regional Helicopter Training Center in Melgar, Colombia. The helicopters had... Read more

New US Army PIF division chief focuses on modernization

New US Army PIF division chief focuses on modernization

26-Aug-2019Source: US Army

The U.S Army Combat Capabilities Development Command Aviation & Missile Center Engineering Directorate Prototype Integration Facility announced a new division chief. Miranda Oden was named the new CCDC Aviation & Missile Center PIF division chief in July. She takes over for Danny Featherston, who retired from government service in April after 15 years leading the... Read more

S.A.F.E. awarded US Army contract

S.A.F.E. awarded US Army contract

30-Jul-2019Source: S.A.F.E Structure Designs

S.A.F.E Structure Designs, a global leader in the design, engineering and manufacturing of ergonomic safety-first aircraft maintenance stands, fall protection platforms, hangar equipment, portable field equipment and specialty tooling, has announced that they have been awarded the contract to manufacture a full line of maintenance platforms, hangar equipment and specialty tooling for the United States... Read more

Advanced Technology Systems Co. Awarded $18M Contract for Helicopter Maintenance

Advanced Technology Systems Co. Awarded $18M Contract for Helicopter Maintenance

22-Jul-2019Source: US DoD

Advanced Technology Systems Co. Inc.,* McLean, Virginia, was awarded a $17,896,404 firm-fixed-price contract for helicopter maintenance. Bids were solicited via the internet with nine received. Work will be performed in Fort Benning, Georgia, with an estimated completion date of June 27, 2024. Fiscal 2019 operations and maintenance, Army funds in the amount of $400,000 were... Read more

Copyright © 2024 HeliHub

Website by Design Inc

Helihub logo

X